Skip to content
⚡ Booking 2-week install windows across Mildura & the Sunraysia — call to secure your slot 0413 635 112
Mildura EV Chargers

Charger specialist

Tritium DC fast charger installation in Mildura

Tritium is an Australian DC fast charger manufacturer based in Brisbane — one of the few homegrown EV charger companies operating at scale globally. RTM75 (75kW), PKM150 (150kW), high-power variants up to 350kW. We install Tritium across Mildura for fleet operators, service stations, dealerships and public charging projects. Project work — not same-day installs.

★★★★★ Google rated Licensed VIC & NSW Same-day quotes
★★★★★ 5-star Google rated
Same-day quotes across Mildura
5-year warranty on workmanship
Licensed VIC & NSW REC + NECA + insurance
Sister of NextES Full electrical depth

What's included

  • Tritium RTM75 (75kW DC)
  • Tritium PKM150 (150kW DC)
  • Tritium high-power 350kW
  • Australian-engineered (Brisbane)
  • Strong networked-fleet support
  • OCPP / proprietary backend options

Who this is for

  • Service station operators adding DC fast
  • Fleet depots with depot charging needs
  • Councils deploying public DC
  • Dealerships installing customer-facing fast chargers

Our scope on every install

1 Feasibility study
2 Site assessment and supply
3 Network connection (grid upgrade)
4 Civil and concrete
5 Charger install + commissioning
6 Maintenance and remote monitoring

Brands and products

All major Australian EV charger brands. No vendor lock-in.

Tritium RTM75 Tritium PKM150 Tritium high-power

EV brands

We install chargers for every EV and PHEV brand

Tesla, BYD, MG, Polestar, Kia, Hyundai, BMW, Mercedes-Benz, Volvo, Mitsubishi and more. Pick your brand for model-specific install guidance.

Don't see your brand? Call us — we install for any Type 2 EV.

How it works

1

Get a quote

Call us or send a quick form. We'll do a phone or on-site assessment and send a fixed quote within a day.

2

Site visit

We check your switchboard, supply, and where you want the charger mounted. Quote is locked in.

3

Install

A clean install — usually 3-4 hours, longer if a switchboard upgrade is part of it. We tidy as we go.

4

Demo & sign-off

Walk-through of how to use it, app set-up, certificate of compliance issued.

Frequently asked questions

How much does a DC fast charger cost?+
A 50kW DC fast charger installed at a typical commercial site is usually $50,000-$120,000+ all-in (hardware + civil + grid connection + commissioning), depending heavily on the grid upgrade required. Larger 150kW+ chargers cost considerably more. Most public DC sites today are co-funded with a state government grant or a fuel company partner.
How long does a DC fast charger project take?+
From feasibility to commissioning, typically 4-9 months. Grid connection paperwork with the network provider is usually the long pole — Powercor and Essential Energy both have queues for new high-load connections. We start that paperwork early.
What is OCPP and why should I care?+
OCPP (Open Charge Point Protocol) is the industry-standard communication protocol for EV chargers. OCPP-compliant chargers can be managed centrally, you can switch software providers without replacing hardware, you can run billing/access control, and you can integrate with fleet management tools. For any commercial install we strongly recommend OCPP-compliant hardware — no vendor lock-in.

Get a quote — Tritium DC

Tell us what you need. We'll come back within one business day with a quote or a few questions.

We'll come back within one business day. Or call us on 0413 635 112.

Call now Get a quote