Service area
EV charger installer in Mildura
We're local Mildura sparkies who install EV chargers across the city — from the riverfront homes near Apex Park to the new estates south past Eleventh Street, out through the industrial estate near the airport, and across to Mildura West. Our base is on Seventh Street so the longest drive to a job in Mildura is about 15 minutes. Same-day quotes are standard, install lead times are usually under two weeks.
EV charger installation in Mildura
Mildura's EV count is climbing fast — Teslas, Polestars, BYDs (Atto 3 dominates), Kia EV6s, MGs, plus a growing fleet of LDV electric utes for tradies. Most home installs we do in Mildura are 7kW single phase in a carport or garage, mounted off the meter box wall where supply allows. Properties on three phase (some of the older Riverside places, larger blocks south of town, and most of the post-2010 estates) can take 22kW chargers that halve the charging time. We've installed across central Mildura, Mildura South, Mildura West, around the schools, the riverfront, and the entire ring of estates running out toward Irymple. Switchboard upgrades come up regularly in Mildura — many homes still have ceramic-fuse boards from the 1970s and 80s. We handle this in-house so it's one job, one crew, one quote. For commercial work we cover the CBD, the industrial estate, hospitality venues along Langtree, and the hotel/motel strip on Deakin Avenue. NCC May 2024 EV-ready compliance on new apartment builds is something we're doing more of as Mildura's residential development continues.
Common install scenarios in Mildura
- →Tesla Wall Connector in a carport — 7kW single phase, 3-4 hour install
- →BYD Atto 3 owner — 7kW Zappi or Wallbox install, often paired with existing solar
- →Three phase 22kW for a Polestar or Mercedes EQE — bigger lots or commercial dwellings
- →Commercial multi-bay setup at hotels, motels or workplaces — load-managed
- →Switchboard upgrade + EV charger package for older homes
Services we install in Mildura
Mildura, VIC 3500
How it works
Get a quote
Call us or send a quick form. We'll do a phone or on-site assessment and send a fixed quote within a day.
Site visit
We check your switchboard, supply, and where you want the charger mounted. Quote is locked in.
Install
A clean install — usually 3-4 hours, longer if a switchboard upgrade is part of it. We tidy as we go.
Demo & sign-off
Walk-through of how to use it, app set-up, certificate of compliance issued.
Frequently asked questions
How much does a home EV charger cost to install in Mildura?+
How long does it take to install an EV charger?+
Do I need a single phase or three phase EV charger?+
Do you install Tesla Wall Connectors?+
Where do you install EV chargers?+
Will my switchboard need upgrading for an EV charger?+
Other EV services we offer
Get a quote — Mildura
Tell us what you need. We'll come back within one business day with a quote or a few questions.