EV charger services
Mains power upgrades for EV charging — Mildura and Sunraysia
Plenty of Mildura and Sunraysia homes can't take a fast EV charger as-is. The supply from the street is too small, or it's single phase and you need three phase, or the existing main switch can't handle the extra load. We do mains power upgrades — coordinated with Powercor (VIC) or Essential Energy (NSW) — so your supply is ready before the charger goes in. Same crew, no second contractor, packaged into the EV install quote.
What's included
- →Single-to-three-phase conversions
- →Supply amperage increases (60A → 80A → 100A)
- →Network coordination with Powercor / Essential Energy
- →Service mains replacement
- →Switchboard work done in-house at the same time
- →Quoted as part of the EV install — one job, one price
Who this is for
- →Homes wanting a 22kW three-phase EV charger but currently on single phase
- →Older homes with undersized service mains (still on 32A or 60A supply)
- →Properties where the EV install requires more amperage than current supply
- →Commercial sites adding multiple EV chargers needing total supply increase
- →Properties on rural supply where amperage is constrained
Our scope on every install
Brands and products
All major Australian EV charger brands. No vendor lock-in.
EV brands
We install chargers for every EV and PHEV brand
Tesla, BYD, MG, Polestar, Kia, Hyundai, BMW, Mercedes-Benz, Volvo, Mitsubishi and more. Pick your brand for model-specific install guidance.
Don't see your brand? Call us — we install for any Type 2 EV.
How it works
Get a quote
Call us or send a quick form. We'll do a phone or on-site assessment and send a fixed quote within a day.
Site visit
We check your switchboard, supply, and where you want the charger mounted. Quote is locked in.
Install
A clean install — usually 3-4 hours, longer if a switchboard upgrade is part of it. We tidy as we go.
Demo & sign-off
Walk-through of how to use it, app set-up, certificate of compliance issued.
Frequently asked questions
What if my home only has single phase but I want three phase?+
Do I need a single phase or three phase EV charger?+
Will my switchboard need upgrading for an EV charger?+
How much does a home EV charger cost to install in Mildura?+
How long does it take to install an EV charger?+
Other EV services we offer
Get a quote — Mains power upgrades
Tell us what you need. We'll come back within one business day with a quote or a few questions.