Skip to content
⚡ Booking 2-week install windows across Mildura & the Sunraysia — call to secure your slot 0413 635 112
Mildura EV Chargers

Service area

EV charger installer in Irymple

Irymple's bigger lots and longer driveways mean two things for EV charging: cable runs are sometimes longer than in town, and three phase supply is more common because of irrigation pumps and sheds. Both work in your favour — most Irymple properties are well set up for fast home charging once we sort the right cable run and any switchboard work. We're 10 minutes down Eleventh Street from our base.

★★★★★ Google rated Licensed VIC & NSW Same-day quotes
★★★★★ 5-star Google rated
Same-day quotes across Mildura
5-year warranty on workmanship
Licensed VIC & NSW REC + NECA + insurance
Sister of NextES Full electrical depth

EV charger installation in Irymple

Irymple sits south of Mildura along the Calder Highway. We've done installs across the established residential streets near the school, around the Irymple Football Club, and on the lifestyle blocks running out toward Cardross and the wider rural strip. Properties on the highway side tend to have shorter cable runs from meter to garage; the larger horticulture and lifestyle lots south sometimes need 30-40 metres of cable to reach a carport or shed. That adds a bit in materials but isn't a problem technically. The big advantage in Irymple — three phase supply from an irrigation pump, packing shed or workshop is often already there. We re-use that supply for a 22kW charger rather than paying for a network upgrade. EV-wise, Irymple's seeing a mix of Teslas, BYD Atto 3s, Kia EV6s and a growing number of plug-in hybrid utes (BYD Shark 6, Mitsubishi Outlander PHEV). Older homes around the established streets sometimes need a switchboard upgrade before the EV charger goes in — flagged in the quote.

Common install scenarios in Irymple

  • Three phase 22kW where existing irrigation supply can be re-used
  • Long cable run installs on larger lifestyle blocks (30-40m)
  • Tesla Wall Connector standard install at residential addresses
  • BYD Shark 6 PHEV install for tradie/farmer households
  • Solar-aware Zappi pairing for existing solar homes

Services we install in Irymple

Irymple, VIC 3498

How it works

1

Get a quote

Call us or send a quick form. We'll do a phone or on-site assessment and send a fixed quote within a day.

2

Site visit

We check your switchboard, supply, and where you want the charger mounted. Quote is locked in.

3

Install

A clean install — usually 3-4 hours, longer if a switchboard upgrade is part of it. We tidy as we go.

4

Demo & sign-off

Walk-through of how to use it, app set-up, certificate of compliance issued.

Frequently asked questions

How much does a home EV charger cost to install in Mildura?+
A standard 7kW single-phase home EV charger installed at a typical Mildura home runs from around $1,500 to $2,500 all-in (charger + install + certification), depending on the brand of charger you choose and the length of the cable run from your switchboard to the install point. Three-phase 22kW installs and jobs that need a switchboard upgrade cost more. We give you a fixed quote after a site visit so there are no surprises.
Do I need a single phase or three phase EV charger?+
About 90% of Australian homes are single phase, and most current EVs accept a maximum of 7-11kW onboard charging anyway, which a single phase 7kW charger handles fine. Three phase 22kW is worth it only if (a) your home is already on three phase and (b) your EV accepts 11kW or 22kW onboard. If you're not sure what your EV accepts, we'll check the spec for you before we quote — no point paying for capacity you can't use.
How long does it take to install an EV charger?+
Most home EV chargers we install in Mildura take 3-4 hours on site, from arrival to walk-through. If a switchboard upgrade is needed it adds another half day. From the time you call us to the day the charger's on the wall is usually 1-2 weeks.
My garage is 30+ metres from the switchboard — is that a problem?+
Not technically — longer cable runs are common on larger Sunraysia properties. Cable cost goes up with length (it's thicker copper, the further it runs) and we'll need to confirm the run path. Most installs handle this for a few hundred dollars extra in materials. We confirm the route on the site visit.

Get a quote — Irymple

Tell us what you need. We'll come back within one business day with a quote or a few questions.

We'll come back within one business day. Or call us on 0413 635 112.

Call now Get a quote